Video Log 2025-02-17: Beginning Compositing, Infrastructure Changes

time1 mo agoview2 views

This video log was a bit rambling. I started with the compositing tests, and then wandered through various infrastructure changes and release plans for this year.

Chapters:
    00:00   Intro
    00:11   Compositing test (TB-2-C shot) removing stray ink lines
    01:35   Nodes and workflow for compositing
    02:50   Patching paint-layer errors (planning)
    03:33   Archival project / annual reports for 2024
    04:01   Pelican static blog, possible migrations for old posts
    04:56   Revising Production Log back to the beginning (for migration)
    05:53   Infrastructure changes
    06:03   Gumroad no longer supports physical products.
    06:13   Self-hosted storefront options
    07:30   New ISP and closer colocation option
    09:20   Publication plans for limited-edition DVD release
    11:58   Soundtrack/Soundfile CD -- ethics and administration issues
    12:58   "Active" and "Passive" contributions
    14:00   4-disc limited edition concept
    15:34   Concluding summary
    15:45   Compositing time requirements (estimating)
    16:30   Other finishing work: animation and recovery
    16:50   Suiting Up and Aquarium Room recovery
    18:59   Fireworks (sort of late Chinese New Year, I guess)
    19:06   Cat (Patty)

For more about the DVD release ideas, see the Production Log article, Pilot-Episode DVDs.

For whatever reason, I didn't get around to editing and uploading this until June!

Loading comments...